South Florida just landed a nuclear energy headquarters. A company called Ampera picked Palm Beach Gardens for its global base and signed a lease for nearly 100,000 square feet across two buildings at 354 and 358 Hiatt Drive. Move-in is slated for January next year. Ampera’s nuclear energy headquarters is another sign that energy demand, advanced technology, and commercial real estate are starting to overlap in Palm Beach County.
Key Takeaways
-
Ampera’s nuclear energy headquarters is moving to Palm Beach Gardens after leasing about 100,000 SF.
-
Ampera focuses on transportable 15–30 MW nuclear microreactors.
-
The company expects to hire about 100 local employees by late 2026.
Where Ampera’s nuclear energy headquarters will be.
Ampera’s nuclear energy headquarters will be located in Palm Beach Gardens, inside the Gardens Innovation Center at PGA National Commerce Park, spanning two buildings at 354 and 358 Hiatt Drive and totaling nearly 100,000 square feet, according to public reports. The Business Development Board has identified 358 Hiatt Drive, Suite 104, as the company’s worldwide headquarters address. That detail matters for local real estate because Ampera is not treating this as a symbolic or minimal presence.
Instead, the site is being positioned as a core operating hub that will house administration and executive leadership, research and development, engineering, and manufacturing and assembly operations. That combination is significant. Locations that blend R&D with production typically require longer leases, custom buildouts, and sustained hiring, making them far more durable than short-term office moves and signaling a deeper, long-term commitment to Palm Beach County.
What is Ampera?
Ampera says it is developing microreactors, which are small nuclear systems designed to deliver steady, around-the-clock power in a compact, transportable form. According to the company’s public release, Ampera’s systems are fully containerized and planned in 15 MWe configurations for defense use and 30 MWe configurations for commercial use, with intended applications ranging from AI data centers and cloud infrastructure to industrial facilities and remote locations.
The company also states that its design is thorium-fueled and uses a hybrid fusion–fission approach. These descriptions reflect Ampera’s stated plans, not a commercially proven product currently operating in the market. One additional claim to note carefully is that Ampera says it is backed by an unnamed Fortune 500 technology leader in AI, cloud, and data-center infrastructure, though no specific company is identified in the release.
Why South Florida and why Palm Beach Gardens
According to the Business Development Board of Palm Beach County, Ampera selected Palm Beach Gardens for a combination of talent, infrastructure, and livability. The region offers a strong and growing engineering workforce, an expanding technology and financial sector, and convenient access to multiple airports that support executive travel and recruiting.
On that last point, Palm Beach International Airport serves as the closest major commercial airport for many Palm Beach Gardens businesses and positions itself as the gateway to the county. From a local-market perspective, this is why Ampera’s nuclear energy headquarters matters. High-skill employers tend to cluster where deep talent pipelines and fast access to capital intersect, and Palm Beach County has been deliberately building that mix.
The bigger ecosystem plays in Palm Beach County
Palm Beach County has been deliberately strengthening an innovation corridor that runs from Palm Beach Gardens through West Palm Beach, with a focus on technology, finance, and defense-related growth. One recent example is the Gold Coast Tech Accelerator, launched in West Palm Beach with dedicated tracks for FinTech and dual-use and defense technology startups. When accelerators, expanding office and flex space, and new employers concentrate in the same geography, it can reset what typical real estate demand looks like, particularly for office and light industrial space, short-term rentals used by relocating staff, and housing in nearby neighborhoods with strong schools and manageable commutes. That broader ecosystem shift is the real estate backdrop behind Ampera’s nuclear energy headquarters landing here.
Jobs, office absorption, and the housing ripple
Ampera expects to add roughly 100 jobs by the end of 2026, with longer-term projections pointing to as many as 2,500 positions tied to future full-scale production elsewhere in Palm Beach County within five years. Those figures are projections, not guarantees, but even the near-term hiring has practical implications. A nearly 100,000-square-foot headquarters lease represents real office and flex-space absorption, which can tighten availability for other mid-sized tenants searching in North County.
On the workforce side, high-skill teams typically blend local hires with relocated talent, increasing housing demand in Palm Beach Gardens for shorter commutes and school zones, Jupiter for its lifestyle appeal, and West Palm Beach for its deeper rental inventory, downtown access, and proximity to Brightline. If the headquarters requires specialized buildouts such as lab space, assembly areas, or enhanced security, those improvements also move through local permitting channels, an area where Palm Beach Gardens offers centralized building and business services.
FAQ About Ampera’s Nuclear Energy Headquarters
Is Ampera’s nuclear energy headquarters a nuclear power plant?
No. Ampera’s nuclear energy headquarters is an office and operations site. It is not an announcement of a local power plant build.
Where is Ampera’s nuclear energy headquarters in South Florida?
Public announcements place Ampera’s nuclear energy headquarters in Palm Beach Gardens at the Gardens Innovation Center in PGA National Commerce Park, with the BDB listing 358 Hiatt Drive, Suite 104 as the worldwide HQ address.
What is a microreactor?
A microreactor is a compact nuclear reactor concept designed for smaller-scale power needs, with some designs intended to be transportable. The U.S. DOE describes microreactors as compact reactors that could be small enough to be transported by truck and used for certain energy challenges.
Who regulates microreactors in the U.S.?
For civilian use, the U.S. Nuclear Regulatory Commission (NRC) is the key regulator. The NRC has a dedicated section covering microreactors and work tied to licensing and deployment models.
How many jobs could Ampera’s nuclear energy headquarters bring?
The Business Development Board says the company expects 100 positions by the end of 2026, with a longer-term projection of more jobs as it scales.
Local help for buyers, sellers, and investors in South Florida
If you’re weighing a move or an investment near Palm Beach Gardens’ business corridor, around PGA Boulevard, I-95, and the areas near the Gardens Innovation Center, work with a South Florida real estate team that tracks employer moves, new commercial buildouts, school zones, flood maps, and HOA financials.
For clear, hands-on guidance across Palm Beach Gardens and nearby Palm Beach County communities, reach out to The Mastropieri Group, Realtors at (561) 544-7000.
Posted by Larry Mastropieri
Enjoy this blog post? Click here to subscribe for updates

Leave A Comment